# dimctrl script
.! echo `date -u` " " >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
.! echo `date -u` " " >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
.! echo `date -u` "First DRS Calibration Script starting up..." >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
.! echo `date -u` "-------------------------------------------" >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log

.w 2000
# As a First step we want to calibrate the current, which are read from the bias crate,
# and not take a DRS calibration, as it is mentioned in the data taking page...
# so for this we should get the feedback and biasctrl programs into known states
# I think it is good to try a RECONNECT to the bias, and make sure the voltage is off
# Since we do not know, what the feedback program is doing at the moment, we should as well, 
# tell it to keep its mouth shut ... just to be sure, we know whats going on
FEEDBACK/STOP
.w 2000
# stopping should always be possible, and end in state 'Connected'(6)
.s FEEDBACK 6

#BIAS_CONTROL/RECONNECT
# If we were disconnected, and this was the first try of the night, the bias_ctrl should
# be in state 'VoltageOff'(7) more or less immediately
#.s BIAS_CONTROL 3
#.s BIAS_CONTROL 7 5000
# if these assumptions are all wrong, then we might have been properly connected anyway, 
# and just have to ramp down... lets do it, but wait forever, in case it does not work
BIAS_CONTROL/SET_ZERO_VOLTAGE
.w 2000
.s BIAS_CONTROL 7

# in case we reach this line, the voltages are all off, and the feedback does not do anything
# So lets do the current calibration, therefor we tell the bias crate to ramp up just 1 single DAC count(~22mV)
# the result of this action is, to get bias_ctrl into the state 'VoltageOn'(9), but since we only go one DAC count it shouldn't take long
BIAS_CONTROL/SET_GLOBAL_DAC 1
.w 2000
.s BIAS_CONTROL 9

# now we may tell the feedback program to calibrate the currents ... 
# I do not understand, if I have to explicitely allow the feedback program to generate output,
# or if it just produces output...
# As far as I understand, the feedback output enable status is the same, 
# as it was before I send the STOP command... so it is unknown at this point.
# and in addition enabling or disabling the output, when STOPed is not possible as far as I know... 
# I try to enable it anyway.
FEEDBACK/ENABLE_OUTPUT yes
.w 2000

.! echo `date -u` "calibrating bias crate current readings..." >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log 
FEEDBACK/CALIBRATE_CURRENTS
.w 5000
# in order to find out when the calibration ends, we have to wait for the transistion from state
# 'Calibrating'(13) back to 'Connected'(6)
.s FEEDBACK 13
.s FEEDBACK 6

# Thomas Bretz told me, that the feedback, after this is step has disabled its output
# and is in the mode, we might call 'temperature control' even there is no temerature beeing controlled.
# I don't know where the voltage is ... in order to perform the calibration, the feedback had to 
# ramp up to 2V below the operational voltage, i.e. about 1V below the breakdown voltage

# We want to take a DRS amplitude calibration so we have to ramp down the bias voltage.
# this 10sec wait is needed in order for the bias not to disconect all the time...
.! echo `date -u` "current calibration done" >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log 
.w 10000

BIAS_CONTROL/SET_ZERO_VOLTAGE
.w 5000
.s BIAS_CONTROL 7

# So now we can take the 3 runs, which are called DRS amplitude calibration:
# A pedestal run with ROI=1024
# A gain calibration run with ROI=1024
# and a second pedestal run, with the same ROI as our next data will be, i.e. ROI=300 in this case
.! echo `date -u` "taking DRS:Pedestal 1000 ..." >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
FAD_CONTROL/START_DRS_CALIBRATION
###FAD_CONTROL/SET_FILE_FORMAT 0  
MCP/START -1 1000 drs-pedestal
.s FAD_CONTROL 8
.s FAD_CONTROL 4
.! echo `date -u` "... done" >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log

.! echo `date -u` "taking DRS:Gain 1000 ..." >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
MCP/START -1 1000 drs-gain
.s FAD_CONTROL 8
.s FAD_CONTROL 4
.! echo `date -u` "... done" >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log

.! echo `date -u` "taking Pedestal 1000 ..." >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
MCP/START -1 1000 pedestal
.s FAD_CONTROL 8
.s FAD_CONTROL 4
.! echo `date -u` "... done" >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log

# okay this is the DRS calibration for the next few runs.
# we are now asked to take again a pedestal run, which can be used, to 
# calculate the electronics noise for instance ... since the shutter is closed and the 
# voltage is off .. there should not be alot of signal in it :-)
.! echo `date -u` "taking crosscheck Pedestal 1000 ..." >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
FAD_CONTROL/SET_FILE_FORMAT 2
###FAD_CONTROL/SET_FILE_FORMAT 0
MCP/START -1 1000 pedestal
.s FAD_CONTROL 8
.s FAD_CONTROL 4
.! echo `date -u` "... done" >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log

# now we want to take a run, with dark counts events 
# so we need to ramp up the voltage
# we want to use the 'current control' more so we give the commands for this...
.! echo `date -u` "switching on bias ..." >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
FEEDBACK/STOP
FEEDBACK/START_CURRENT_CONTROL 0.0
FEEDBACK/ENABLE_OUTPUT yes
# the feedback should be in state 'CurrentControl'(12) now
.s FEEDBACK 12

# now we give the feedback a hint, that it may ramp ... 
BIAS_CONTROL/SET_GLOBAL_DAC 1
# after this command the bias_ctrl should be in state 'VoltageOn'(9) after a second or so
.s BIAS_CONTROL 9
# then usually it takes some time until the feedback has enough information to really start controlling the voltage
# when the feedback actually kicks in, the bias is first in state 'Ramping'(5) for some seconds and finally in 'VoltageOn'(9)
# again
.s BIAS_CONTROL 5
.s BIAS_CONTROL 9
# here we should wait 45 sec in order for the current control to get enough current readings and temp readings to stabilize..
.! echo `date -u` "...waiting 45sec for the current control..." >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
.w 45000
.! echo `date -u` "... done" >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log

# so now we can take the dark count run ... 
# this might be changed in the future ... either the number of events or the the ROI might be changed
# then the DRS calibration above, and the pedestal run in between have to be changed as well.
.! echo `date -u` "taking Pedestal with BIAS on 3000 ..." >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
MCP/START -1 3000 pedestal
.s FAD_CONTROL 8
.s FAD_CONTROL 4
.! echo `date -u` "... done" >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log

# at the end the bias voltage should be ramped down, since in a few seconds a shifter wit ha flashlight
# will come out to open the shutter...
.! echo `date -u` "switching OFF bias ..." >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
BIAS_CONTROL/SET_ZERO_VOLTAGE
.s BIAS_CONTROL 7

.! echo `date -u` "This is the end of First DRS Calibration" >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
.! echo `date -u` "----------------------------------------------------" >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
.! echo `date -u` " " >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log
.! echo `date -u` " " >> ~/FACT++/ScriptsForDimCtrl/DataTaking.log