TIME:        
Measurement Source Value
X To close click here or press Esc.

HELP

Loading a schedule

To load a schedule click on the corresponding date in the calendar. If you click on SAVE the schedule will be saved to the date shown in the box close to the SAVE button. It is always identical with the last calender date you clicked.

Remarks about saving

If saving fails, an error message is displayed. If it was supposed to be successful, the schedule of the selected date is newly loaded and displayed.

Replacing a schedule

You can overwrite a schedule with the schedule from a different date by entering the date in the box close to Load Night and either pressing Enter or the Load Night button.

Disabled entries

Entries which are at the time the schedule is loaded already in the past, are disabled and cannot be changed. This is because they might already have been processed by the scheduler and are currently executed.

Color of times

For the current night, entries which are before the current time are displayed in red, entries which are later, are displayed in green. Colors are updated interactively.

Scheduling

Note that the last entry display in red will most probably be the first one executed by the scheduler. If the scheduler (Main.js) is running, it will just replace the next entry in the schedule and be executed completely. If the scheduler (Main.js) is not running, still the last red entry will be the first one to be executed, but since it is the first one executed by the script, the script assumes that it failed and was restarted. Therefore, only the last of its observations (usually data) is executed.

Suspend

If a suspend is scheduled, all further observations are discarded. The suspend itself is just a sleep. If very soon, a new observation will be started, it is best to schedule the suspend before it, otherwise the observation might get started before the suspend is executed. Note that a suspend does not interrupt the current observation, but will work as a normal entry, i.e. the previous measurement (usually a data run) will be finished before the suspend is executed.

Resume

If a resume is scheduled, it has the same effect as if the preceeding suspend was removed. That effectively means that the last observation which was scheduled before the resume will be executed as it if just became valid. Consequently, if it is scheduled close to the change of observation, it makes sense to schedule it after this observation, to avoid that the previous observation becomes effective.

Options

Options are ecoded as JSON object (search google for details). The meaning of their properties is defined by the task to be executed. The starting and closing brace must be omitted. Note that for a correct JSON object, the property names must be enclosed in double quotation marks ("...").