1 | \section{Requirements to start full GRB observations}
|
---|
2 |
|
---|
3 | In the previous sessions we described the status and tasks we still plan to do
|
---|
4 | in order to complete the GRB Alarm System.
|
---|
5 | At the same time, also the other different subsystems of the MAGIC telescope have
|
---|
6 | to implement and test strategies for the GRB survey.
|
---|
7 |
|
---|
8 | \par
|
---|
9 |
|
---|
10 | We strongly push the responsible persons of the Drive-, Camera-, AMC- and Central
|
---|
11 | Control subsystems to fulfill the criteria defined in~\cite{design}. We suggest
|
---|
12 | to make a one week shift where the experts meet and test the GRB
|
---|
13 | strategies. In order to avoid good observation time we suggest to make the shift
|
---|
14 | during a Moon period. This shift should take place, in arrangement with the
|
---|
15 | different subsystem managers, before April this year. The time limitation is
|
---|
16 | based on the moment when SWIFT will start to work fully automatically and send
|
---|
17 | alerts in real time to the ground stations.
|
---|
18 | \par
|
---|
19 |
|
---|
20 | We present now a list of tasks which are crucial for the GRB survey:
|
---|
21 |
|
---|
22 | \par
|
---|
23 |
|
---|
24 | \begin{itemize}
|
---|
25 | \item {\bf Fast slewing:}\
|
---|
26 |
|
---|
27 | One of the most important issues is to implement and test the fast slewing capability
|
---|
28 | of the telescope. In particular, the communication between CC and Cosy has still to be implemented for
|
---|
29 | the case of fast movements.
|
---|
30 |
|
---|
31 | \item {\bf Use of look-up tables:}\
|
---|
32 |
|
---|
33 | The use of look-up tables to correct the mirror focus during the slewing to the GRB
|
---|
34 | coordinates is desirable. In the alert situation it is a waste of time if we would have to
|
---|
35 | close the camera lids and carry out the full laser adjustment ($\sim 5$~min) before starting the observation.
|
---|
36 | The reproducibility of the focus with the use of look-up tables has to be proven.
|
---|
37 | In case of using lookup-tables during the slewing, it is necessary to change the protocol between the AMC and CC.
|
---|
38 |
|
---|
39 | \item {\bf Behaviour of the camera during moon:}\
|
---|
40 |
|
---|
41 | It has still to be checked what happens when the telescope points directly at the Moon while
|
---|
42 | slewing toward a new position. The GRB Alert System prevents a burst closer than $30^\circ$
|
---|
43 | from the Moon to be pointed.
|
---|
44 | However, it can happen that during the movement of the telescope the Moon will enter the FoV.
|
---|
45 | In this case the HV of the PMTs will be reduced automatically and will not increase fast enough for the
|
---|
46 | GRB observation.
|
---|
47 | \end{itemize}
|
---|
48 |
|
---|