Changeset 6165 for trunk/MagicSoft


Ignore:
Timestamp:
02/01/05 12:34:19 (20 years ago)
Author:
garcz
Message:
*** empty log message ***
File:
1 edited

Legend:

Unmodified
Added
Removed
  • trunk/MagicSoft/GRB-Proposal/Strategies.tex

    r6162 r6165  
    2525The duty-cycle in~\cite{NICOLA} will be increased by taking into account that \ma should also observe the afterglow emission of an burst that occured up to 5 hours before the start of the shift. Different GRB models predict delayed prompt GeV emission as well as acceleration of photons during the afterglows up to the threshold energy of \ma (for more details see chapter 5).
    2626
    27 The afterglow observation is equivalent to an increase of the duty-cycle of about 6 days per month.\\
    28 
     27The afterglow observation is equivalent to an increase of the duty-cycle of about 6 days per month.
    2928
    3029\subsection{GRB observations in case of moon shine}
     
    5756\subsection{Active Mirror Control behaviour}
    5857
    59 To reduce the time before starting of the observation, the use of the look-up tables (LUTs) is necessary.
     58To reduce the time before starting the observation, the use of the look-up tables (LUTs) is necessary.
    6059Once generated, the {\it AMC} will use the LUTs and automaticaly focus the panels for a given telescope position. The {\it CC} should send the burst coordinates to the {\it Drive} and the {\it AMC} software in the same time. In this way the panels could be focussed already during the telescope movement.
    6160
     
    111110
    112111\begin{itemize}
    113 \item In case of a repeated outbursts for a longer time period of direct observation
    114 \item In the other case for having Off-data at exactly the same sky location.
     112\item In case of a repeated outbursts for a longer time period of direct observation.
     113\item In the other case for having off-data at exactly the same sky location.
    115114\end{itemize}
Note: See TracChangeset for help on using the changeset viewer.