Timeline
03/29/19:
- 16:42 FlareAlertsSent edited by
- added alerts on 421 (diff)
- 15:30 Changeset [19478] by
- adapted path for programs
- 15:29 Changeset [19477] by
- updated mysql-setup
- 15:28 Changeset [19476] by
- updated mysql-setup
- 15:25 Changeset [19475] by
- updated mysql-setup
- 15:16 Changeset [19474] by
- implemented possibility to skip magic-weather info
- 14:56 Changeset [19473] by
- fixed query of CU
- 14:54 Changeset [19472] by
- fixed paths of programs
- 14:53 Changeset [19471] by
- adapted to mysql-usage on gate
- 14:53 Changeset [19470] by
- get swift schedule more often
- 14:33 Changeset [19469] by
- fixed bug
03/28/19:
- 23:51 Changeset [19468] by
- minor fixes.
- 23:51 Changeset [19467] by
- The Dim Command was not up-to-date.
- 23:50 Changeset [19466] by
- Opening wasn't handled.
- 23:50 Changeset [19465] by
- Made waiting time for possible bias ramping consistent with Main.js.
- 23:50 Changeset [19464] by
- Set HAVE_CURL and HAVE_MAILX when found.
- 22:06 Changeset [19463] by
- Was missing
- 22:03 Changeset [19462] by
- Was missing
- 22:03 Changeset [19461] by
- Was missing
- 22:01 Changeset [19460] by
- Was missing.
- 21:30 Changeset [19459] by
- Use IsConnected rather than is_open to avoid toggling when no connection is possible.
- 21:29 Changeset [19458] by
- Fixed two typos in some screen output.
- 21:28 Changeset [19457] by
- The prefix was missing for the offset-file.
- 21:26 Changeset [19456] by
- Use the script location as the root path for relative file locations.
- 20:55 Changeset [19455] by
- I directly split now filog lename and log path into the two resources, this is more transparent for the user.
- 20:51 Changeset [19454] by
- I directly split now filename and default path into the two resources, this is more transparent for the user.
- 20:50 Changeset [19453] by
- moon was missing
- 18:42 InstallingFACT++ edited by
- (diff)
- 18:40 Changeset [19452] by
- This implements changes which are required for follow-up observations. Note that up to date these are untested and will be rolled out and debugged in La Palam in the next days.
03/18/19:
- 22:47 Changeset [19451] by
- removed not needed lines of code
- 22:46 Changeset [19450] by
- fixed bug for two resumes scheduled without suspend inbetween
03/15/19:
- 17:45 Changeset [19449] by
- fixed typo, added CalcSource
03/12/19:
- 19:05 Changeset [19448] by
- fixed issue with datacheck
- 16:49 Changeset [19447] by
- updated crab flux for QLA
- 14:36 Changeset [19446] by
- added correction and conversion factors for ISDC and new analysis
03/10/19:
- 21:05 Changeset [19445] by
- updated CU (incl zd/th correction)
Note:
See TracTimeline
for information about the timeline view.