| 1 | = after a power cut = |
| 2 | |
| 3 | == restart hard- and software == |
| 4 | |
| 5 | - phone numbers for MAGIC shift crew: [http://www.magic.iac.es/contacts/], login with user "FACT" and the usual password |
| 6 | - contact the MAGIC shift crew to switch '''gate''' back on |
| 7 | - go to [https://trac.fact-project.org/wiki/TroubleShootingComputers%20} and switch the other computers back on in the given order |
| 8 | - IMPORTANT: it might be that "Raid Pwr1" has to be switched on BEFORE newdaq can boot |
| 9 | - TODO: second raid? [http://10.0.100.232/]? where to be switched back on? |
| 10 | - '''before''' you start the vnc and screen sessions: go to [http://10.0.100.100/] to check if the pump is working, the bias power is enabled and the cooling liquid flow meter is measuring enough throughput. In case some of it aren't, go to [http://10.0.100.232/] and switch BIAS, LID and PUMP back on. |