Changes between Version 5 and Version 6 of DataTakingCheckList


Ignore:
Timestamp:
08/08/13 13:42:04 (11 years ago)
Author:
ftemme
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • DataTakingCheckList

    v5 v6  
    3232||  || insert schedule to DB ||  ||  ||  ||  ||  ||  ||  ||  ||  ||
    3333||  || write planned schedule in shift summary ||  ||  ||  ||  ||  ||  ||  ||  ||  ||
    34 || telescope status || check telescope status in IR cam and tpoint CCD ||  ||  ||  ||  ||  ||  ||  ||  ||  ||
     34|| telescope status || start tpoint CCD (via page 10.0.100.230)  ||  ||  ||  ||  ||  ||  ||  ||  ||  ||
     35||  || check telescope status in IR cam and tpoint CCD ||  ||  ||  ||  ||  ||  ||  ||  ||  ||
    3536|||| **Startup** ||
    3637|| Start Drive || PWR_CONTROL/TOGGLE_DRIVE ||  ||  ||  ||  ||  ||  ||  ||  ||  ||